top of page

Offsite Manufacture, What Irish Residential Construction Needs?

  • Writer: CooleyCS
    CooleyCS
  • May 26, 2022
  • 1 min read

In the final installment before the event on the 25th May at the Guiness Store House I answer questions on how MMC and Offsite can be an integral part of a wider solution that in some way can help alleviate the housing crisis in Ireland. MMC should be a primary element in the development process it should be cost planned at Stage 2 , all projects would benefit from an offsite strategy at planning stage this could involve standardisation, logistics proposals or even a kit of parts or the final step of a full volumetric system .The benefits of adopting an MMC approach are to be further discussed at the round table events where ideas and experiences can be shared.





 
 
 

Comments


LOGO TRANSPARENT.png

CONTACT US

1 Greenland Street  |  London  |  NW1 0ND

  • LinkedIn
  • YouTube
Choose which service(s) you want to enquire about Required

Thanks for submitting!

© 2024 Cooley Construction Services. All Rights Reserved.

JLM Logo-Colour.png
bottom of page